
Have a question?
Please get in touch with our team in case of any queries
THE CENTRAL AND EASTERN EUROPE DATA CENTER CONSTRUCTION MARKET SIZE WAS VALUED AT USD 652 MILLION IN 2023 AND IS EXPECTED TO REACH USD 1.33 BILLION BY 2029, GROWING AT A CAGR OF 12.67%.
The Central and Eastern Europe Data Center Construction Market Research Report Includes Size, Share, and Growth in Terms of
- Support Infrastructure: Electrical Infrastructure, Mechanical Infrastructure, and General Construction
- Electrical Infrastructure: UPS Systems, Generators, Transfer Switches & Switchgear, PDUs, and Other Electrical Infrastructure
- Mechanical Infrastructure: Cooling Systems, Racks, and Other Mechanical Infrastructure
- Cooling Systems: CRAC & CRAH Units, Chiller Units, Cooling Towers, Condensers & Dry Coolers, Economizers & Evaporative Coolers, and Other Cooling Units
- Cooling Techniques: Air-based Cooling and Liquid-based Cooling
- General Construction: Core & Shell Development, Installation & Commissioning Services, Engineering & Building Design, Physical Security, Fire Detection & Suppression, and DCIM/BMS
- Tier Standards: Tier I & II, Tier III, and Tier IV
- Geography: Russia, Poland, Austria, Czechia, and Other Central & Eastern European Countries
Industry Analysis Report, Regional Outlook, Growth Potential, Price Trends, Competitive Market Share & Forecast 2024–2029.
This report includes market data points, ranging from trend
analyses to market estimates & forecasts that you can customize
CENTRAL AND EASTERN EUROPE DATA CENTER CONSTRUCTION MARKET REPORT SCOPE
REPORT ATTRIBUTE | DETAILS |
---|---|
MARKET SIZE - INVESTMENT (2029) | USD 1.33 Billion |
MARKET SIZE - INVESTMENT (2023) | USD 652 Million |
CAGR - INVESTMENT (2023-2029) | 12.67% |
MARKET SIZE - AREA (2029) | 1,069 Thousand Square Feet |
POWER CAPACITY (2029) | 197 MW |
HISTORIC YEAR | 2020-2022 |
BASE YEAR | 2023 |
FORECAST YEAR | 2024-2029 |
MARKET SEGMENTS | Support Infrastructure, Electrical Infrastructure, Mechanical Infrastructure, Cooling Systems, Cooling Techniques, General Construction, Tier Standard, and Geography |
REGIONAL ANALYSIS | Russia, Poland, Austria, Czechia, and Other Central & Eastern European Countries |
MARKET OVERVIEW
The Central and Eastern Europe data center construction market by investment was valued at USD 652 million in 2023 and is expected to reach USD 1.33 billion by 2029, growing at a CAGR of 12.67% during the forecast period. The market is witnessing growth in terms of development and operations. The growing popularity of the Internet of Things (IoT), the emergence of 5G networks, the adoption of cloud-based services, and the demand for streaming online entertainment content at high speeds are the major factors driving the growth of the Central and Eastern Europe data center construction market. Moreover, the availability of adequate land, low power cost, free cooling, and renewable energy in Central and Eastern Europe are likely to attract more investors in the market. Furthermore, some preferred locations by regional data center operators include Poland and Austria. The Ukraine-Russia conflict negatively impacted the growth of the country as many multinationals and tech companies imposed sanctions and quit the country. The political instability between the countries will lead to a decline in Russia's data center investment and development. However, we expect the situation to ease and cool in one to two years, after which we expect the market to pace up in terms of data center investments.
KEY TRENDS
- Digitalization across businesses will contribute to a surge in data center investments by colocation, cloud, internet, and telecommunication providers.
- Telecom companies such as Orange, T-Mobile, A1 Telekom, O2 (Telefonica), Vodafone, and others are responsible for deploying and introducing 5G services in the region.
- The trend of procuring renewable energy to power its data center facilities by data center operators will likely continue during the forecast period. Several operators are signing power purchase agreements with renewable energy companies. For instance, In November 2023, Google signed a Power Purchase Agreement (PPA) to procure renewable energy in Poland to generate 50MW of electricity from wind farms.
- The demand for data storage and hosting services will likely increase in the region, which is why the Central & Eastern Europe data center construction market will likely witness new players' entry.
- Supply chain disruptions, increasing inflation rates, shortage of skilled workforce, and political disturbances in Russia are likely to have a negative impact on the market.
SEGMENTATION INSIGHTS
- Incorporating modular power infrastructure will likely provide higher Operational Expenditure (OPEX) savings for data centers over time as they are efficient, require lower maintenance, and reduce space.
- The importance of monitoring is growing with the adoption of intelligent real-time monitoring software with automation and Artificial Intelligence (AI) features that can predict maintenance requirements, component failures, and automatic switchovers for uninterrupted operations.
- In terms of cooling systems, free cooling techniques have grown significantly in the Central and Eastern Europe data center construction market over the last few years across regions with favorable climatic conditions that can use evaporative/adiabatic coolers for data center cooling purposes.
- Innovative designs such as district heating are expected to grow among data centers developed in colder climatic conditions. For instance, Floridsdorf Hospital in Vienna, Austria, received waste heat from Digital Realty’s data center facility in Vienna, Austria.
- AI techniques regarding fire safety systems have grown significantly globally over the last few years. It is used in fire detection systems and control panels of fire safety systems in data centers. It helps to control fire at an early stage.
- Innovative technologies, such as HYGOOD Acoustic Nozzle and iFLOW Technology, are used in data center fire safety systems.
- Apart from construction, installation, and commissioning services, data centers also invest in improving physical security, monitoring, and management of facilities through DCIM in real time.
GEOGRAPHICAL ANALYSIS
Russia
- In 2023, the Russian data center construction market witnessed an investment of around USD 223 million, which was around a growth of 17% from 2022.
- Around 335 MW of data center capacity will be added to the Russian market during 2023-2029. Some of Russia's major data center providers include Russia's State Nuclear Energy Corporation (Rosatom), OBIT, Wildberries, Key Point, 3Data, and others.
Poland
- In 2023, the Poland data center construction market witnessed an investment of around USD 187 million, around a 1.08% increase in investment compared to 2022. Major Data center investors in Poland include Atman Data Centre, Vantage Data Centers, and Data4.
- Poland's data center market is among the emerging markets and has recently witnessed growth. The market has witnessed several new entrants, such as Data4 and Vantage Data Centers, that are building their presence in the market.
- One of the major factors driving the Poland market is increasing land prices and unavailability of land to scale up in prime locations in Western European countries such as the UK and Germany, leading to investors shifting their focus to markets such as Poland, that offer ample availability of land and power with options to scale up stably.
Austria
- Austria holds a significant position in the Central and Eastern Europe data center construction market and witnessed an increase in investment of 18% as compared to 2022. Major Data center investors in Poland include Atman Data Centre, Vantage Data Centers, and Data4.
- The market is witnessing the entry of several global cloud companies investing in the market. For instance, Microsoft and Google planned to open a dedicated cloud region nationwide. Amazon Web Services has planned to open an edge location in the country.
- The investment by all these major operators will allow other global colocation operators, such as Equinix, Vantage Data Centers, and others, to enter the market and explore the benefits and opportunities offered by the country.
Other Central & Eastern European Countries
- Other countries include Czechia, Hungary, Bulgaria, Croatia, Estonia, Slovakia, and others. These countries witnessed one to two investments, and the trend is expected to remain the same for the next two to three years.
- The demand from Russia will likely shift to these countries due to the political instability between Russia and Ukraine. These countries have ample land and the presence of global operators such as Digital Realty in Croatia and Equinix in Bulgaria.
VENDOR LANDSCAPE
- Vendors such as Schneider Electric, Rittal, Hewlett Packard Enterprise, and Delta Electronics provide infrastructure based on OCP design. This will aid in market revenue growth for these vendors, as many organizations prefer solutions such as 48V DC UPS systems.
- The growth in data center activities across the Central and Eastern Europe data center construction market will be a major source of revenue for construction contractors. Some prominent construction contractors in the Central & Eastern Europe data center construction market include AECOM, Arup, DataDome, Deerns, Flour Corporation, ISG, Mercury, Turner & Townsend, Winthrop Engineering and Contracting, and others.
- The major colocation operators active in the Central and Eastern Europe data center construction market include Rostelecom, IXcellerate, 3data, Equinix, Digital Realty, NTT Global Data Centers, 3S Group, and others.
- The Central and Eastern Europe data center construction market provides several opportunities to operators. Several players enter the market to explore the region and enjoy the opportunities.
SNAPSHOT
The Central and Eastern Europe data center construction market size by investment will reach USD 1.33 billion by 2029, growing at a CAGR of 12.67% from 2023 to 2029.
The following factors are likely to contribute to the growth of the Central and Eastern Europe data center construction market during the forecast period:
- Adoption of Cloud-Based Services
- IoT & Big Data Drive The Demand for Data Centers
- Increase in Data Center Investments
Base Year: 2023
Forecast Year: 2024-2029
The study considers the present scenario of the Central and Eastern Europe data center construction market and its market dynamics for 2024−2029. It covers a detailed overview of several market growth enablers, restraints, and trends. The report offers both the demand and supply aspects of the market. It profiles and examines leading companies and other prominent ones operating in the market.
The report includes the investment in the following areas:
- Support Infrastructure
- Electrical Infrastructure
- Mechanical Infrastructure
- General Construction
- Electrical Infrastructure
- UPS Systems
- Generators
- Transfer Switches & Switchgear
- PDUs
- Other Electrical Infrastructure
- Mechanical Infrastructure
- Cooling Systems
- Racks
- Other Mechanical Infrastructure
- Cooling Systems
- CRAC & CRAH Units
- Chiller Units
- Cooling Towers, Condensers, & Dry Coolers
- Economizers & Evaporative Coolers
- Other Cooling Units
- Cooling Techniques
- Air-based Cooling
- Liquid-based Cooling
- General Construction
- Core & Shell Development
- Installation & Commissioning Services
- Engineering & Building Design
- Physical Security
- Fire Detection & Suppression
- DCIM/BMS
- Tier Standards
- Tier I & II
- Tier III
- Tier IV
- Geography
- Russia
- Poland
- Austria
- Czechia
- Other Central & Eastern European Countries
Major Vendors
- Prominent Support Infrastructure Providers
- 3M
- Business Overview
- Product Offerings
- ABB
- Aermec
- Airedale
- Aksa Power Generation
- Alfa Laval
- Carrier
- Caterpillar
- Condair
- Cummins
- Daikin Applied
- Delta Electronics
- Eaton
- HITEC Power Protection
- Johnson Controls
- KyotoCooling
- Legrand
- Mitsubishi Electric
- Perkins Engines
- Piller Power Systems
- Rittal
- Rolls-Royce
- Schneider Electric
- Siemens
- STULZ
- Trane (Ingersoll Rand)
- Vertiv
- Prominent Construction Contractors
- AECOM
- Business Overview
- Service Offerings
- Altron
- AODC
- Arup
- Aurora Group
- DataDome
- Deerns
- DIPL-Ing. H. C. Hollige
- Fluor Corporation
- Free Technologies Engineering
- GreenMDC
- Haka Moscow
- ICT Facilities
- IMOS
- ISG
- KKCG Group
- Mace
- Mercury
- PORR Group
- STRABAG
- TECHKO
- Tetra Tech
- Turner & Townsend
- Warbud
- Winthrop Engineering and Contracting
- ZAUNERGROUP
- Prominent Data Center Investors
- 3dataBusiness
- Overview
- Service Offerings
- 3S Group
- Amazon Web Services
- Artnet
- Atman
- Beyond.pl
- ClusterPower
- Data4
- Digital Realty
- Equinix
- IXcellerate
- Magenta Telekom
- Microsoft
- Neterra
- Netia
- NTT DATA
- Orange Business Services
- Rostelecom Data Centers
- Stadtwerke Feldkirch
- T-Mobile
- Vantage Data Centers
- VK Cloud Solutions
- Yandex
- New Entrants
- AtlasEdge
- Business Overview
- Service Offerings
Frequently Asked Questions
How many MW of power capacity is expected to reach the Central and Eastern Europe data center construction market by 2029?
How big is the Central and Eastern Europe data center construction market?
What are the key trends in the Central & Eastern Europe data center construction market?
What is the growth rate of the Central and Eastern Europe data center construction market?
What is the estimated market size in terms of area in the Central and Eastern Europe data center construction market by 2029?
Exhibit 1: Market Derivation
Exhibit 2: Overview of Central & Eastern Data Center Construction Market
Exhibit 3: A NRI 2023 Model
Exhibit 5: Factors Considered to Achieve Sustainability Goals
Exhibit 6: Sustainability Targets by Data Center Operators in CEE
Exhibit 7: Usage of Big Data and IoT in Several Industries
Exhibit 8: Key Takeaways from Survey Conducted by Turner & Townsend 2023
Exhibit 9: Survey Conducted by Uptime Institute on Supply Chain
Exhibit 10: Risk in Central & Eastern Europe Countries (2022–2023)
Exhibit 11: Some Common Threats in Edge Computing
Exhibit 12: Overview of Central & Eastern Europe Data Center Construction Market
Exhibit 13: Cumulative Power Capacity Market Share by Central & Eastern Europe 2024–2029
Exhibit 14: Central & Eastern Europe Data Center Construction Market by Investment 2020–2029 ($ million)
Exhibit 15: Central & Eastern Europe Data Center Construction Market by Area 2020–2029 (thousand square feet)
Exhibit 16: Central & Eastern Europe Data Center Construction Market by Power Capacity 2020–2029 (MW)
Exhibit 17: Snapshot of Central & Eastern Europe Data Center Construction Market by Support Infrastructure ($ million)
Exhibit 18: Cumulative Investment Opportunity by Support Infrastructure (2024–2029)
Exhibit 19: Central & Eastern Europe Data Center Construction Market by Electrical Infrastructure 2020-2029 ($ million)
Exhibit 20: Central & Eastern Europe Data Center Construction Market by Mechanical Infrastructure 2020–2029 ($ million)
Exhibit 21: Central & Eastern Europe Data Center Construction Market by General Construction 2020–2029 ($ million)
Exhibit 22: Snapshot of Central & Eastern Europe Data Center Construction Market by Electrical Infrastructure ($ million)
Exhibit 23: Cumulative Investment Opportunities by Electrical Infrastructure (2024–2029)
Exhibit 24: Major Vendors in Electrical Infrastructure (2023)
Exhibit 25: Overview of Central & Eastern Europe Data Center Construction Market by Electrical Infrastructure
Exhibit 26: Central & Eastern Europe Data Center Construction Market by UPS System 2020–2029 ($ million)
Exhibit 27: Central & Eastern Europe Data Center Construction Market by Generators 2020–2029 ($ million)
Exhibit 28: Central & Eastern Europe Data Center Construction Market by Transfer Switches & Switchgear 2020–2029 ($ million)
Exhibit 29: Central & Eastern Europe Data Center Construction Market by PDUs 2020–2029 ($ million)
Exhibit 30: Central & Eastern Europe Data Center Construction Market by Other Electrical Infrastructure 2020–2029 ($ million)
Exhibit 31: Snapshot of Central & Eastern Europe Data Center Construction Market by Mechanical Infrastructure ($ million)
Exhibit 32: Cumulative Investment Opportunities by Mechanical Infrastructure (2024–2029)
Exhibit 33: Major Vendors in Mechanical Infrastructure (2023)
Exhibit 34: Central & Eastern Europe Data Center Construction Market by Cooling Systems 2020–2029 ($ million)
Exhibit 35: Central & Eastern Europe Data Center Construction Market by Racks 2020–2029 ($ million)
Exhibit 36: Central & Eastern Europe Data Center Construction Market by Other Mechanical Infrastructure 2020–2029 ($ million)
Exhibit 37: Snapshot of Central & Eastern Europe Data Center Construction Market by Cooling Systems ($ million)
Exhibit 38: Cumulative Investment Opportunities by Cooling System (2024–2029)
Exhibit 39: Major Vendors in Cooling Systems
Exhibit 40: Overview of Central & Eastern Europe Data Center Construction Market by Cooling Systems
Exhibit 41: Central & Eastern Europe Data Center Construction Market by CRAC & CRAH Units 2020–2029 ($ million)
Exhibit 42: Central & Eastern Europe Data Center Construction Market by Chiller Units 2020–2029 ($ million)
Exhibit 43: Central & Eastern Europe Data Center Construction Market by Cooling Towers, Condensers, & Dry Coolers 2020–2029 ($ million)
Exhibit 44: Central & Eastern Europe Data Center Construction Market by Economizers & Evaporative Coolers 2020–2029 ($ million)
Exhibit 45: Central & Eastern Europe Data Center Construction Market by Other Cooling Units 2020–2029 ($ million)
Exhibit 46: Snapshot of Central & Eastern Europe Data Center Construction Market by Cooling Techniques ($ million)
Exhibit 47: Cumulative Investment Opportunities by Cooling Techniques (2024–2029)
Exhibit 48: Central & Eastern Europe Data Center Construction Market by Air-Based Cooling 2020–2029 ($ million)
Exhibit 49: Central & Eastern Europe Data Center Construction Market by Liquid-Based Cooling 2020–2029 ($ million)
Exhibit 50: Snapshot of Central & Eastern Europe Data Center Construction Market by General Construction ($ million)
Exhibit 51: Cumulative Investment Opportunities by General Construction (2024–2029)
Exhibit 52: Major Vendors in General Construction
Exhibit 53: Overview of Central & Eastern Europe Data Center Construction Market by General Construction
Exhibit 54: Central & Eastern Europe Data Center Construction Market by Core & Shell Development 2020–2029 ($ million)
Exhibit 55: Central & Eastern Europe Data Center Construction Market by Installation & Commissioning Services 2020–2029 ($ million)
Exhibit 56: Central & Eastern Europe Data Center Construction Market by Engineering & Building Design 2020–2029 ($ million)
Exhibit 57: Central & Eastern Europe Data Center Construction Market by Physical Security 2020–2029 ($ million)
Exhibit 58: Central & Eastern Europe Data Center Construction Market by Fire Detection & Suppression 2020–2029 ($ million)
Exhibit 59: Central & Eastern Europe Data Center Construction Market by DCIM/BMS 2020–2029 ($ million)
Exhibit 60: Snapshot of Central & Eastern Europe Data Center Construction Market by Tier Standards ($ million)
Exhibit 61: Cumulative Investment Opportunity by Tier Standards (2024–2029)
Exhibit 62: Overview of Central & Eastern Europe Data Center Construction Market by Tier Standards
Exhibit 63: Central & Eastern Europe Tier I & II Data Center Construction Market 2020–2029 ($ million)
Exhibit 64: Central & Eastern Europe Tier III Data Center Construction Market 2020–2029 ($ million)
Exhibit 65: Central & Eastern Europe Tier IV Data Center Construction Market 2020–2029 ($ million)
Exhibit 66: Overview of Russia Data Center Construction Market
Exhibit 67: Russia Data Center Construction Market by Investment 2020–2029 ($ million)
Exhibit 68: Russia Data Center Construction Market by Area 2020–2029 (thousand square feet)
Exhibit 69: Russia Data Center Construction Market by Power Capacity 2020–2029 (MW)
Exhibit 70: Split of Renewable Energy for Russia (2022)
Exhibit 71: Data Center Support Infrastructure Market in Russia 2020–2029 ($ million)
Exhibit 72: Overview of Poland Data Center Construction Market
Exhibit 73: Poland Data Center Construction Market by Investment 2020–2029 ($ million)
Exhibit 74: Poland Data Center Construction Market by Area 2020–2029 (thousand square feet)
Exhibit 75: Poland Data Center Construction Market by Power Capacity 2020–2029 (MW)
Exhibit 76: Split of Renewable Energy for Poland (2022)
Exhibit 77: Data Center Support Infrastructure Market in Poland 2020–2029 ($ million)
Exhibit 78: Overview of Austria Data Center Construction Market
Exhibit 79: Austria Data Center Construction Market by Investment 2020–2029 ($ million)
Exhibit 80: Austria Data Center Construction Market by Area 2020–2029 (million square feet)
Exhibit 81: Austria Data Center Construction Market by Power Capacity 2020–2029 (MW)
Exhibit 82: Split of Renewable Energy for Austria (2022)
Exhibit 83: Austria Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Exhibit 84: Overview of Czechia Data Center Market
Exhibit 85: Czechia Data Center Construction Market by Investment 2020–2029 ($ million)
Exhibit 86: Czechia Data Center Construction Market by Area 2020–2029 (thousand square feet)
Exhibit 87: Czechia Data Center Construction Market by Power Capacity 2020–2029 (MW)
Exhibit 88: Split of Renewable Energy for Czechia (2022)
Exhibit 89: Czechia Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Exhibit 90: Overview of Other Central & Eastern European Countries Data Center Construction Market
Exhibit 92: Other Central & Eastern European Countries Data Center Construction Market by Investment 2020–2029 ($ million)
Exhibit 93: Other Central & Eastern European Countries Data Center Construction Market by Area 2020–2029 (thousand square feet)
Exhibit 94: Other Central & Eastern European Countries Data Center Construction Market by Power Capacity 2020–2029 (MW)
Exhibit 95: Split of Renewable Energy for Other Central & Eastern European Countries
Exhibit 96: Other Central & Eastern European Countries Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Exhibit 97: Site Selection Criteria
LIST OF TABLES
Table 1: NRI Ranking (2023)
Table 2: List of Internet Exchange Points in Central & Eastern Europe
Table 3: List of Upcoming Data Center Projects Across Central & Eastern Europe (2024 Onwards)
Table 4: Some Renewable Energy Initiatives in Central & Eastern Europe in 2023
Table 5: Central & Eastern Europe Data Center Construction Market 2020–2029
Table 6: Central & Eastern Europe Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Table 7: Central & Eastern Europe Data Center Construction Market by Electrical Infrastructure 2020–2029 ($ million)
Table 8: Central & Eastern Europe Data Center Construction Market by Mechanical Infrastructure 2020–2029 ($ million)
Table 9: Central & Eastern Europe Data Center Construction Market by Cooling Systems 2020–2029 ($ million)
Table 10: Central & Eastern Europe Data Center Construction Market by Cooling Techniques 2020–2029 ($ million)
Table 11: Central & Eastern EuroNo table of contents entries found.pe Data Center Construction Market by General Construction 2020–2029 ($ million)
Table 12: Central & Eastern Europe Data Center Construction Market by Tier Standards 2020–2029 ($ million)
Table 13: Central & Eastern Europe Data Center Construction Market by Geography 2020–2029 ($ million)
Table 14: Central & Eastern Europe Data Center Construction Market by Geography 2020–2029 (thousand square feet)
Table 15: Central & Eastern Europe Data Center Construction Market by Geography 2020–2029 (MW)
Table 16: Russia Data Center Construction Market 2020–2029
Table 17: Russia Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Table 18: Poland Data Center Construction Market 2020–2029
Table 19: Poland Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Table 20: Austria Data Center Construction Market 2020–2029
Table 21: Austria Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Table 22: Czechia Data Center Construction Market 2020–2029
Table 23: Czechia Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Table 24: Other Central & Eastern European Countries Data Center Construction Market 2020–2029
Table 25: Other Central & Eastern European Countries Data Center Construction Market by Support Infrastructure 2020–2029 ($ million)
Table 26: Currency Conversion Table (2016–2023)
1. REPORT COVERAGE
1.1. WHAT’S INCLUDED
1.2. SEGMENTAL COVERAGE
1.2.1. Market Segmentation by Support Infrastructure
1.2.2. Market Segmentation by Electrical Infrastructure
1.2.3. Market Segmentation by Mechanical Infrastructure
1.2.4. Market Segmentation by Cooling Systems
1.2.5. Market Segmentation by Cooling Techniques
1.2.6. Market Segmentation by General Construction
1.2.7. Market Segmentation by Tier Standards
2. PREMIUM INSIGHTS
2.1. KEY HIGHLIGHTS
2.2. MARKET OVERVIEW
2.3. KEY TRENDS
2.4. SEGMENTAL ANALYSIS
2.5. GEOGRAPHY ANALYSIS
2.6. VENDOR ANALYSIS
3. MARKET AT A GLANCE
4. INTRODUCTION
4.1. OVERVIEW
4.2. THE NETWORK READINESS INDEX
4.2.1. Technology
4.2.2. People
4.2.3. Governance
4.2.4. Impact
4.3. INTERNET EXCHANGE POINTS
5. MARKET OPPORTUNITIES & TRENDS
5.1. SUSTAINABILITY INITIATIVES ATTRACT DATA CENTER & CLOUD OPERATORS
5.2. GROWTH IN 5G CONNECTIVITY & DEPLOYMENT OF EDGE DATA CENTERS
5.3. ADOPTION OF AI-BASED INFRASTRUCTURE
6. MARKET GROWTH ENABLERS
6.1. ADOPTION OF CLOUD-BASED SERVICES
6.2. IOT & BIG DATA DRIVE DEMAND FOR DATA CENTERS
6.3. INCREASE IN DATA CENTER INVESTMENTS
7. MARKET RESTRAINTS
7.1. SUPPLY CHAIN DISRUPTIONS HAMPER MARKET GROWTH
7.2. SITE SELECTION HINDRANCES IN DATA CENTER DEVELOPMENT
7.3. SKILLED WORKFORCE CHALLENGES
7.4. SECURITY CHALLENGES IMPACT DATA CENTER GROWTH
8. MARKET LANDSCAPE
8.1. MARKET OVERVIEW
8.2. INVESTMENT: MARKET SIZE & FORECAST
8.3. AREA: MARKET SIZE & FORECAST
8.4. POWER CAPACITY: MARKET SIZE & FORECAST
9. SUPPORT INFRASTRUCTURE
9.1. MARKET SNAPSHOT
9.2. KEY HIGHLIGHTS
9.3. ELECTRICAL INFRASTRUCTURE
9.3.1. Market Overview
9.3.2. Investment: Market Size & Forecast
9.4. MECHANICAL INFRASTRUCTURE
9.4.1. Market Overview
9.4.2. Investment: Market Size & Forecast
9.5. GENERAL CONSTRUCTION
9.5.1. Market Overview
9.5.2. Investment: Market Size & Forecast
10. ELECTRICAL INFRASTRUCTURE
10.1. MARKET SNAPSHOT
10.2. KEY HIGHLIGHTS
10.3. MARKET OVERVIEW
10.4. UPS SYSTEMS
10.4.1. Market Overview
10.4.2. Investment: Market Size & Forecast
10.5. GENERATORS
10.5.1. Market Overview
10.5.2. Investment: Market Size & Forecast
10.6. TRANSFER SWITCHES & SWITCHGEAR
10.6.1. Market Overview
10.6.2. Investment: Market Size & Forecast
10.7. PDUS
10.7.1. Market Overview
10.7.2. Investment: Market Size & Forecast
10.8. OTHER ELECTRICAL INFRASTRUCTURE
10.8.1. Market Overview
10.8.2. Investment: Market Size & Forecast
11. MECHANICAL INFRASTRUCTURE
11.1. MARKET SNAPSHOT
11.2. KEY HIGHLIGHTS
11.3. MARKET OVERVIEW
11.4. COOLING SYSTEMS
11.4.1. Market Overview
11.4.2. Investment: Market Size & Forecast
11.5. RACKS
11.5.1. Market Overview
11.5.2. Investment: Market Size & Forecast
11.6. OTHER MECHANICAL INFRASTRUCTURE
11.6.1. Market Overview
11.6.2. Investment: Market Size & Forecast
12. COOLING SYSTEMS
12.1. MARKET SNAPSHOT
12.2. KEY HIGHLIGHTS
12.3. MARKET OVERVIEW
12.4. CRAC & CRAH UNITS
12.4.1. Market Overview
12.4.2. Investment: Market Size & Forecast
12.5. CHILLER UNITS
12.5.1. Market Overview
12.5.2. Investment: Market Size & Forecast
12.6. COOLING TOWERS, CONDENSERS, & DRY COOLERS
12.6.1. Market Overview
12.6.2. Investment: Market Size & Forecast
12.7. ECONOMIZERS & EVAPORATIVE COOLERS
12.7.1. Market Overview
12.7.2. Investment: Market Size & Forecast
12.8. OTHER COOLING UNITS
12.8.1. Market Overview
12.8.2. Investment: Market Size & Forecast
13. COOLING TECHNIQUES
13.1. MARKET SNAPSHOT
13.2. KEY HIGHLIGHTS
13.3. MARKET OVERVIEW
13.4. AIR-BASED COOLING
13.4.1. Market Overview
13.4.2. Investment: Market Size & Forecast
13.5. LIQUID-BASED COOLING
13.5.1. Market Overview
13.5.2. Investment: Market Size & Forecast
14. GENERAL CONSTRUCTION
14.1. MARKET SNAPSHOT
14.2. KEY HIGHLIGHTS
14.3. MARKET OVERVIEW
14.4. CORE & SHELL DEVELOPMENT
14.4.1. Market Overview
14.4.2. Investment: Market Size & Forecast
14.5. INSTALLATION & COMMISSIONING SERVICES
14.5.1. Market Overview
14.5.2. Investment: Market Size & Forecast
14.6. ENGINEERING & BUILDING DESIGN
14.6.1. Market Overview
14.6.2. Investment: Market Size & Forecast
14.7. PHYSICAL SECURITY
14.7.1. Market Overview
14.7.2. Investment: Market Size & Forecast
14.8. FIRE DETECTION & SUPPRESSION
14.8.1. Market Overview
14.8.2. Investment: Market Size & Forecast
14.9. DCIM/BMS
14.9.1. Market Overview
14.9.2. Investment: Market Size & Forecast
15. TIER STANDARDS
15.1. MARKET SNAPSHOT
15.2. KEY HIGHLIGHTS
15.3. Market Overview
15.4. TIER I & II
15.4.1. Market Overview
15.4.2. Investment: Market Size & Forecast
15.5. TIER III
15.5.1. Market Overview
15.5.2. Investment: Market Size & Forecast
15.6. TIER IV
15.6.1. Market Overview
15.6.2. Investment: Market Size & Forecast
16. GEOGRAPHY
16.1. RUSSIA
16.1.1. Market Overview
16.1.2. Investment: Market Size & Forecast
16.1.3. Area: Market Size & Forecast
16.1.4. Power Capacity: Market Size & Forecast
16.1.5. Support Infrastructure: Market Size & Forecast
16.2. POLAND
16.2.1. Market Overview
16.2.2. Investment: Market Size & Forecast
16.2.3. Area: Market Size & Forecast
16.2.4. Power Capacity: Market Size & Forecast
16.2.5. Support Infrastructure: Market Size & Forecast
16.3. AUSTRIA
16.3.1. Market Overview
16.3.2. Investment: Market Size & Forecast
16.3.3. Area: Market Size & Forecast
16.3.4. Power Capacity: Market Size & Forecast
16.3.5. Support Infrastructure: Market Size & Forecast
16.4. CZECHIA
16.4.1. Market Overview
16.4.2. Investment: Market Size & Forecast
16.4.3. Area: Market Size & Forecast
16.4.4. Power Capacity: Market Size & Forecast
16.4.5. Support Infrastructure: Market Size & Forecast
16.5. OTHER CENTRAL & EASTERN EUROPEAN COUNTRIES
16.5.1. Market Overview
16.5.2. Investment: Market Size & Forecast
16.5.3. Area: Market Size & Forecast
16.5.4. Power Capacity: Market Size & Forecast
16.5.5. Support Infrastructure: Market Size & Forecast
17. COMPETITIVE LANDSCAPE
17.1. SUPPORT INFRASTRUCTURE
17.2. CONSTRUCTION CONTRACTOR
17.3. DATA CENTER INVESTOR
18. PROMINENT SUPPORT INFRASTRUCTURE PROVIDERS
18.1. 3M
18.1.1. Business Overview
18.1.2. Product Offerings
18.2. ABB
18.2.1. Business Overview
18.2.2. Product Offerings
18.3. AERMEC
18.3.1. Business Overview
18.3.2. Product Offerings
18.4. AIREDALE
18.4.1. Business Overview
18.4.2. Product Offerings
18.5. AKSA POWER GENERATION
18.5.1. Business Overview
18.5.2. Product Offerings
18.6. ALFA LAVAL
18.6.1. Business Overview
18.6.2. Product Offerings
18.7. CARRIER
18.7.1. Business Overview
18.7.2. Product Offerings
18.8. CATERPILLAR
18.8.1. Business Overview
18.8.2. Product Offerings
18.9. CONDAIR
18.9.1. Business Overview
18.9.2. Product Offerings
18.10. CUMMINS
18.10.1. Business Overview
18.10.2. Product Offerings
18.11. DAIKIN APPLIED
18.11.1. Business Overview
18.11.2. Product Offerings
18.12. DELTA ELECTRONICS
18.12.1. Business Overview
18.12.2. Product Offerings
18.13. EATON
18.13.1. Business Overview
18.13.2. Product Offerings
18.14. HITEC POWER PROTECTION
18.14.1. Business Overview
18.14.2. Product Offerings
18.15. JOHNSON CONTROLS
18.15.1. Business Overview
18.15.2. Product Offerings
18.16. KYOTOCOOLING
18.16.1. Business Overview
18.16.2. Product Offerings
18.17. LEGRAND
18.17.1. Business Overview
18.17.2. Product Offerings
18.18. MITSUBISHI ELECTRIC
18.18.1. Business Overview
18.18.2. Product Offerings
18.19. PERKINS ENGINES
18.19.1. Business Overview
18.19.2. Product Offerings
18.20. PILLER POWER SYSTEMS
18.20.1. Business Overview
18.20.2. Product Offerings
18.21. RITTAL
18.21.1. Business Overview
18.21.2. Product Offerings
18.22. ROLLS-ROYCE
18.22.1. Business Overview
18.22.2. Product Offerings
18.23. SCHNEIDER ELECTRIC
18.23.1. Business Overview
18.23.2. Product Offerings
18.24. SIEMENS
18.24.1. Business Overview
18.24.2. Product Offerings
18.25. STULZ
18.25.1. Business Overview
18.25.2. Product Offerings
18.26. TRANE (INGERSOLL RAND)
18.26.1. Business Overview
18.26.2. Product Offerings
18.27. VERTIV
18.27.1. Business Overview
18.27.2. Product Offerings
19. PROMINENT CONSTRUCTION CONTRACTORS
19.1. AECOM
19.1.1. Business Overview
19.1.2. Service Offerings
19.2. ALTRON
19.2.1. Business Overview
19.2.2. Service Offerings
19.3. AODC
19.3.1. Business Overview
19.3.2. Service Offerings
19.4. ARUP
19.4.1. Business Overview
19.4.2. Service Offerings
19.5. AURORA GROUP
19.5.1. Business Overview
19.5.2. Service Offerings
19.6. DATADOME
19.6.1. Business Overview
19.6.2. Service Offerings
19.7. DEERNS
19.7.1. Business Overview
19.7.2. Service Offerings
19.8. DIPL.-ING. H. C. HOLLIGE
19.8.1. Business Overview
19.8.2. Service Offerings
19.9. FLOUR CORPORATION
19.9.1. Business Overview
19.9.2. Service Offerings
19.10. FREE TECHNOLOGIES ENGINEERING
19.10.1. Business Overview
19.10.2. Service Offerings
19.11. GREENMDC
19.11.1. Business Overview
19.11.2. Service Offerings
19.12. HAKA MOSCOW
19.12.1. Business Overview
19.12.2. Service Offerings
19.13. ICT FACILITIES
19.13.1. Business Overview
19.13.2. Service Offerings
19.14. IMOS
19.14.1. Business Overview
19.14.2. Service Offerings
19.15. ISG
19.15.1. Business Overview
19.15.2. Service Offerings
19.16. KKCG GROUP
19.16.1. Business Overview
19.16.2. Service Offerings
19.17. MACE
19.17.1. Business Overview
19.17.2. Service Offerings
19.18. MERCURY
19.18.1. Business Overview
19.18.2. Service Offerings
19.19. PORR GROUP
19.19.1. Business Overview
19.19.2. Service Offerings
19.20. STRABAG
19.20.1. Business Overview
19.20.2. Service Offerings
19.21. TECHKO
19.21.1. Business Overview
19.21.2. Service Offerings
19.22. TETRA TECH
19.22.1. Business Overview
19.22.2. Service Offerings
19.23. TURNER & TOWNSEND
19.23.1. Business Overview
19.23.2. Service Offerings
19.24. WARBUD
19.24.1. Business Overview
19.24.2. Service Offerings
19.25. WINTHROP ENGINEERING AND CONTRACTING
19.25.1. Business Overview
19.25.2. Service Offerings
19.26. ZAUNERGROUP
19.26.1. Business Overview
19.26.2. Service Offerings
20. PROMINENT DATA CENTER INVESTORS
20.1. 3DATA
20.1.1. Business Overview
20.1.2. Service Offerings
20.2. 3S GROUP
20.2.1. Business Overview
20.2.2. Service Offerings
20.3. AMAZON WEB SERVICES
20.3.1. Business Overview
20.3.2. Service Offerings
20.4. ARTNET
20.4.1. Business Overview
20.4.2. Service Offerings
20.5. ATMAN
20.5.1. Business Overview
20.5.2. Service Offerings
20.6. BEYOND.PL
20.6.1. Business Overview
20.6.2. Service Offerings
20.7. CLUSTERPOWER
20.7.1. Business Overview
20.7.2. Service Offerings
20.8. DATA4
20.8.1. Business Overview
20.8.2. Service Offerings
20.9. DIGITAL REALTY
20.9.1. Business Overview
20.9.2. Service Offerings
20.10. EQUINIX
20.10.1. Business Overview
20.10.2. Service Offerings
20.11. GOOGLE
20.11.1. Business Overview
20.11.2. Service Offerings
20.12. IXCELLERATE
20.12.1. Business Overview
20.12.2. Service Offerings
20.13. MAGENTA TELEKOM
20.13.1. Business Overview
20.13.2. Service Offerings
20.14. MICROSOFT
20.14.1. Business Overview
20.14.2. Service Offerings
20.15. NETERRA
20.15.1. Business Overview
20.15.2. Service Offerings
20.16. NETIA
20.16.1. Business Overview
20.16.2. Service Offerings
20.17. NTT DATA
20.17.1. Business Overview
20.17.2. Service Offerings
20.18. ORANGE BUSINESS SERVICES
20.18.1. Business Overview
20.18.2. Service Offerings
20.19. ROSTELECOM DATA CENTERS
20.19.1. Business Overview
20.19.2. Service Offerings
20.20. STADTWERKE FELDKIRCH
20.20.1. Business Overview
20.20.2. Service Offerings
20.21. T-MOBILE
20.21.1. Business Overview
20.21.2. Service Offerings
20.22. VANTAGE DATA CENTERS
20.22.1. Business Overview
20.22.2. Service Offerings
20.23. VK CLOUD SOLUTIONS
20.23.1. Business Overview
20.23.2. Service Offerings
20.24. YANDEX
20.24.1. Business Overview
20.24.2. Service Offerings
21. NEW ENTRANTS
21.1. ATLASEDGE
21.1.1. Business Overview
21.1.2. Service Offerings
22. QUANTITATIVE SUMMARY
22.1.1. Investment: Market Size & Forecast
22.1.2. Support Infrastructure: Market Size & Forecast
22.2. MARKET SEGMENTATION
22.2.1. Electrical Infrastructure: Market Size & Forecast
22.2.2. Mechanical Infrastructure: Market Size & Forecast
22.2.3. Cooling Systems: Market Size & Forecast
22.2.4. Cooling Techniques: Market Size & Forecast
22.2.5. General Construction: Market Size & Forecast
22.2.6. Tier Standards: Market Size & Forecast
22.3. MARKET BY GEOGRAPHY
22.3.1. Investment: Market Size & Forecast
22.3.2. Area: Market Size & Forecast
22.3.3. Power Capacity: Market Size & Forecast
22.4. RUSSIA
22.4.1. Investment: Market Size & Forecast
22.4.2. Support Infrastructure: Market Size & Forecast
22.5. POLAND
22.5.1. Investment: Market Size & Forecast
22.5.2. Support Infrastructure: Market Size & Forecast
22.6. AUSTRIA
22.6.1. Investment: Market Size & Forecast
22.6.2. Support Infrastructure: Market Size & Forecast
22.7. CZECHIA
22.7.1. Investment: Market Size & Forecast
22.7.2. Support Infrastructure: Market Size & Forecast
22.8. OTHER CENTRAL & EASTERN EUROPEAN COUNTRIES
22.8.1. Investment: Market Size & Forecast
22.8.2. Support Infrastructure: Market Size & Forecast
23. APPENDIX
23.1. LIST OF ABBREVIATIONS
23.2. SITE SELECTION CRITERIA
23.3. CURRENCY CONVERSION
Select a license type that suits your business needs
Single User Licence
- Report accessible by one user only
- Free 10% or 3 days of customization
- Free post-sale service assistance
- Continuous support through email
5 User Licence
- Report accessible by 5 users within the organization
- Free 15% or 4.5 days of customization
- Continuous support through email and telephone
- Free analyst hour
- Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge
Corporate Licence
- Free Datasheet worth $1500
- Report accessible by the entire organization
- Free 20% or 6 days of customization
- Free post-sale service assistance
- Continuous support through email and telephone
- Direct access to lead analysts
- Free analyst hour
- Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge
Datasheet Licence
- Report accessible by 1 user only
- Free 15% or 32 hours of customization
- Free post-sale service assistance
- Direct access to lead analysts
Frequently Asked Questions
How many MW of power capacity is expected to reach the Central and Eastern Europe data center construction market by 2029?
How big is the Central and Eastern Europe data center construction market?
What are the key trends in the Central & Eastern Europe data center construction market?
What is the growth rate of the Central and Eastern Europe data center construction market?
What is the estimated market size in terms of area in the Central and Eastern Europe data center construction market by 2029?